INSTRUMENTATION JOB LIST

 

HERE IS A SHORT LIST OF A FEW OF THE JOBS WHERE WE DID THE INSTRUMENTATION.

 

JOB: NAME: Simcoe

OWNER: Regional Municipality of Haldimand-Norfolk

COMPLETION:

GENERAL CONTRACTOR: T.R. Hinan

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: B.J. Tworsanski

SCOPE: Regional Water Well Control System

 

JOB: NAME: Eberts

OWNER: Regional Municipality of Chatham-Kent

COMPLETION:

GENERAL CONTRACTOR: Stonetown Construction

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: DILLON

SCOPE: Construction of new Booster Pumping Station and SCADA SYSTEM

 

JOB: NAME: GTAA Pumping Station

OWNER: Greater Toronto Airport Authority

COMPLETION:

GENERAL CONTRACTOR: Kenaidan Contracting

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: UMA Engineering

SCOPE: Construction of new Sewage Pumping Station

 

JOB: NAME: Elmira WPCP

OWNER: Region of Waterloo

COMPLETION: Fall/Winter 2001

GENERAL CONTRACTOR: Wellington Construction

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: Stantec Consulting

SCOPE: Complete upgrade of Pollution Control Plant


 

JOB: NAME: Beaverton WSP Automation

OWNER: Regional Municipality of Durham

COMPLETION: 3/1/2002

GENERAL CONTRACTOR: Nadeco

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: CH2M Hill Canada Limited

SCOPE: SCADA automation of Water Treatment Plant

 

JOB: NAME: Alpine Ski Club

OWNER: Town of Blue Mountains_Collingwood

COMPLETION: Fall/Winter 2002

GENERAL CONTRACTOR: Hadovic Construction

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: C.C. Tatham & Associates Ltd.

SCOPE: Water Supply System for Snow Making

 

JOB: NAME: Sleepy Hollow

OWNER: Town of Blue Mountains_Collingwood

COMPLETION: Spring 2002

GENERAL CONTRACTOR: Clearway Construction

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: Ainley Group

SCOPE: Remote Sewage Pumping Station

 

JOB: NAME: Cambrige Gas

OWNER: CITY OF CAMBRIDGE

COMPLETION: Ongoing

GENERAL CONTRACTOR: Elgin Construction

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: Connestoga Rovers and Associates

SCOPE: Landfill gas collection system and revise program for billing gas use.

 

 

 

TOP

 

INSTRUMENTATION HOME


 

JOB: NAME: Simcoe

OWNER: Regional Municipality of Haldimand-Norfolk

GENERAL CONTRACTOR: T.R. Hinan

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: B.J, Tworsanski

JOB DESCRIPTION: Regional Water Well Control System

 

COMPLETE SCOPE:

 

On this job Selectra Inc. did the complete electrical installation at the new Simcoe Water Well Pumping Station. We provided the complete Instrumentation package for the Well Station as well as designing and building the RTU control panel.  We also programmed the Bristol Babcock DPC 3330 RTU and provided a five node SCADA system for controlling and monitoring the Simcoe area water supply system. The Wonderware based MMI system used the tower level to control four Regional pumping stations to supply water to The Town of Simcoe.

 

INSTRUMENTATION SUPPLIED:

LEVEL TRANSMITTER:

X

MAGNETIC FLOW METER:

 

ULTRASONIC FLOW METER:

 

MASS FLOW METER:

 

PRESSURE TRANSMITTER:

 

DIFFERENTIAL PRESSURE:

 

TURBIDITY ANALYSER:

 

CHLORINE ANALYSER:

 

 DISOLVED OXYGEN ANALYSER:

 

PH ANALYSER:

 

TEMPERATURE TRANSMITTER:

 

NUCULER DENSITY:

 

GAS DETECTION:

 

PRESSURE SWITCHES:

X

TEMPERATURE SWITCHES:

X

LEVEL SWITCHES/PROBES:

X

SIGNAL CONDITIONERS:

 

OTHER:

 

 

CONTROL PANEL INFORMATION:

PANEL DESCRIPTION

NUMBER

OF PANELS

RPU MANUFACTURER

RPU CONTROL PANELS

1

BRISTOL BABCOCK

 

PROGRAMMING AND DEVELOPMENT:

RPU PROGRAMMING:

X

OPERATOR INTERFACE PROGRAMMING:

 

COMPLETE MMI SYSTEM DEVELOPMENT:

X

 


 

 

BACK      TOP


 

JOB: NAME: Eberts

OWNER: Regional Municipality of Chatham-Kent

GENERAL CONTRACTOR: Stonetown Construction

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: Dillon Consulting

JOB DESCRIPTION: Construction of new Booster Pumping Station and SCADA System

 

COMPLETE SCOPE:

 

On this job Selectra did the complete electrical installation at the new Eberts Booster Pumping Station. Under this contract we also built three Bristol Babcock DPC 3330 based RTU control panels; one at the booster Pumping Station, one at the Dresden Elevated Tower, and a Data Concentrator for installation at the Dresden Water Pollution Control Plant. Selectra was responsible for programming the three RTU control panels supplied by us under this contract. We were also responsible for developing the two node Wonderware based SCADA system that tied the complete package together.

 

INSTRUMENTATION SUPPLIED:

LEVEL TRANSMITTER:

X

MAGNETIC FLOW METER:

X

ULTRASONIC FLOW METER:

X

MASS FLOW METER:

 

PRESSURE TRANSMITTER:

X

DIFFERENTIAL PRESSURE:

 

TURBIDITY ANALYSER:

 

CHLORINE ANALYSER:

X

 DISOLVED OXYGEN ANALYSER:

 

PH ANALYSER:

 

TEMPERATURE TRANSMITTER:

 

NUCULER DENSITY:

 

GAS DETECTION:

 

PRESSURE SWITCHES:

 

TEMPERATURE SWITCHES:

X

LEVEL SWITCHES/PROBES:

 

SIGNAL CONDITIONERS:

 

OTHER:

 

 

CONTROL PANEL INFORMATION:

PANEL DESCRIPTION

NUMBER

OF PANELS

RPU MANUFACTURER

RPU CONTROL PANELS

3

BRISTOL BABCOCK

 

PROGRAMMING AND DEVELOPMENT:

RPU PROGRAMMING:

X

OPERATOR INTERFACE PROGRAMMING:

 

COMPLETE MMI SYSTEM DEVELOPMENT:

X

 

BACK     TOP


 

JOB: NAME: GTAA Pumping Station

OWNER: Greater Toronto Airport Authority

GENERAL CONTRACTOR: Kenaidan Contracting

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: UMA Engineering

JOB DESCRIPTION: Construction of new Sewage Pumping Station

 

COMPLETE SCOPE:

 

On this job Selectra did the complete electrical installation at the new GTAA Sewage Pumping Station. We were responsible for the design and manufacture of an Allen-Bradley SLC 5/04 control panel.  Selectra did the PLC and operator interface programming. As well, the development of a single node Wonderware SCADA System linking the new pumping station to an operator terminal in the Plumbing shop was developed in house.

 

INSTRUMENTATION SUPPLIED:

LEVEL TRANSMITTER:

X

MAGNETIC FLOW METER:

 

ULTRASONIC FLOW METER:

 

MASS FLOW METER:

 

PRESSURE TRANSMITTER:

 

DIFFERENTIAL PRESSURE:

 

TURBIDITY ANALYSER:

 

CHLORINE ANALYSER:

 

 DISOLVED OXYGEN ANALYSER:

 

PH ANALYSER:

 

TEMPERATURE TRANSMITTER:

 

NUCULER DENSITY:

 

GAS DETECTION:

X

PRESSURE SWITCHES:

 

TEMPERATURE SWITCHES:

X

LEVEL SWITCHES/PROBES:

X

SIGNAL CONDITIONERS:

 

OTHER:

 

 

CONTROL PANEL INFORMATION:

PANEL DESCRIPTION

NUMBER

OF PANELS

RPU MANUFACTURER

PLC CONTROL PANELS

1

ALLEN-BRADLEY

 

PROGRAMMING AND DEVELOPMENT:

RPU PROGRAMMING:

X

OPERATOR INTERFACE PROGRAMMING:

X

COMPLETE MMI SYSTEM DEVELOPMENT:

X

 


 

BACK     TOP

 

JOB: NAME: Elmira WPCP

OWNER: Region of Waterloo

GENERAL CONTRACTOR: Wellington Construction

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: Stantec Consulting

JOB DESCRIPTION: Complete upgrade of Water Pollution Control Plant

 

COMPLETE SCOPE:

 

This job involved the complete reworking of the Elmira Water Pollution Control Plant.  Selectra was the Electrical Contractor on this project. Electrically, Selectra was responsible for installation of the complete underground from the service entrance to the feeders for the local control panels. We were responsible for the supply and installation of seven Motor Control Centers and the wiring of all of the associated devices including blowers, pumps, and motorized valves. Selectra was also the Instrumentation Contractor on this job. We supplied all of the instrumentation on the job as well as supplying seven SLC 5/04 based control panels and ten local control panels with flex I/O. We also supplied Heater control panels and two Backup Float control panels. Selectra was also responsible for installation of the three communication networks used on this job. The PLC’s were interconnected using a DH+ network, local control panels were interconnected using Remote I/O and the VFD’s used DeviceNet to talk to the PLC’s.  

 

INSTRUMENTATION SUPPLIED:

LEVEL TRANSMITTER:

X

MAGNETIC FLOW METER:

X

ULTRASONIC FLOW METER:

 

MASS FLOW METER:

X

PRESSURE TRANSMITTER:

X

DIFFERENTIAL PRESSURE:

 

TURBIDITY ANALYSER:

 

CHLORINE ANALYSER:

 

 DISOLVED OXYGEN ANALYSER:

X

PH ANALYSER:

 

TEMPERATURE TRANSMITTER:

 

NUCULER DENSITY:

 

GAS DETECTION:

X

PRESSURE SWITCHES:

X

TEMPERATURE SWITCHES:

X

LEVEL SWITCHES/PROBES:

X

SIGNAL CONDITIONERS:

 

OTHER:

 

 

CONTROL PANEL INFORMATION:

PANEL DESCRIPTION

NUMBER

OF PANELS

RPU MANUFACTURER

PLC CONTROL PANELS

7

ALLEN-BRADLEY

 

PROGRAMMING AND DEVELOPMENT:

RPU PROGRAMMING:

 

OPERATOR INTERFACE PROGRAMMING:

 

COMPLETE MMI SYSTEM DEVELOPMENT:

 

 

 

BACK     TOP


 

JOB: NAME: Beaverton WSP Automation

OWNER: Regional Municipality of Durham

GENERAL CONTRACTOR: Nadeco

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: CH2M Hill Canada Limited

JOB DESCRIPTION: SCADA Automation of Water Treatment Plant

 

COMPLETE SCOPE:

 

On the Beaverton job Selectra was the Electrical as well as the Instrumentation Contractor. This job involved the complete automation of the Beaverton Water Treatment Plant. We were responsible for the design and supply of four GE Fanuc based PLC panels that used Ethernet communication to pass information back and forth between themselves and the WonderWare based Operator control stations. The new control system was paralleled with the existing control system so that the Water Plant could be run in manual if necessary.  All of the change over to the new system had to be done with only minor shutdowns as the Water Plant had to remain operational throughout the whole job. Selectra was also responsible for both the programming of the PLC’s and the development of the WonderWare based Man Machine interface for this project.

 

INSTRUMENTATION SUPPLIED:

LEVEL TRANSMITTER:

X

MAGNETIC FLOW METER:

 

ULTRASONIC FLOW METER:

 

MASS FLOW METER:

 

PRESSURE TRANSMITTER:

 

DIFFERENTIAL PRESSURE:

 

TURBIDITY ANALYSER:

 

CHLORINE ANALYSER:

 

 DISOLVED OXYGEN ANALYSER:

X

PH ANALYSER:

X

TEMPERATURE TRANSMITTER:

X

NUCULER DENSITY:

 

GAS DETECTION:

 

PRESSURE SWITCHES:

X

TEMPERATURE SWITCHES:

 

LEVEL SWITCHES/PROBES:

 

SIGNAL CONDITIONERS:

X

OTHER:

 

 

CONTROL PANEL INFORMATION:

PANEL DESCRIPTION

NUMBER

OF PANELS

RPU MANUFACTURER

PLC CONTROL PANELS

4

GE-FANUC

 

PROGRAMMING AND DEVELOPMENT:

RPU PROGRAMMING:

X

OPERATOR INTERFACE PROGRAMMING:

 

COMPLETE MMI SYSTEM DEVELOPMENT:

X

 

 

BACK     TOP


 

JOB: NAME: Alpine Ski Club

OWNER: Town of Blue Mountains_Collingwood

GENERAL CONTRACTOR: Hadovic Construction

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: C.C. Tatham & Associates Ltd.

JOB DESCRIPTION: Water Supply System for Snow Making

 

COMPLETE SCOPE:

 

The Alpine Pumping Station pumps water from Georgian Bay to a snow-making reservoir at the Alpine Ski Club. Selectra was the Electrical as well as the Instrumentation contractor on this job. We were responsible for the complete wiring of the pumping station as well as the design, supply, and programming of the GE Fanuc based PLC control panel.

 

INSTRUMENTATION SUPPLIED:

LEVEL TRANSMITTER:

 

MAGNETIC FLOW METER:

 

ULTRASONIC FLOW METER:

 

MASS FLOW METER:

 

PRESSURE TRANSMITTER:

 

DIFFERENTIAL PRESSURE:

 

TURBIDITY ANALYSER:

 

CHLORINE ANALYSER:

 

 DISOLVED OXYGEN ANALYSER:

 

PH ANALYSER:

 

TEMPERATURE TRANSMITTER:

 

NUCULER DENSITY:

 

GAS DETECTION:

 

PRESSURE SWITCHES:

 

TEMPERATURE SWITCHES:

 

LEVEL SWITCHES/PROBES:

 

SIGNAL CONDITIONERS:

 

OTHER:

 

 

CONTROL PANEL INFORMATION:

PANEL DESCRIPTION

NUMBER

OF PANELS

RPU MANUFACTURER

PLC

1

ALLEN-BRADLEY

 

PROGRAMMING AND DEVELOPMENT:

RPU PROGRAMMING:

X

OPERATOR INTERFACE PROGRAMMING:

 

COMPLETE MMI SYSTEM DEVELOPMENT:

 

 

 

BACK     TOP


 

JOB: NAME: Sleepy Hollow

OWNER: Town of Blue Mountains_Collingwood

GENERAL CONTRACTOR: Clearway Construction

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: Ainley Group

JOB DESCRIPTION: Remote Sewage Pumping Station

 

COMPLETE SCOPE:

 

The Sleepy Hollow Pumping Station is a self-contained sewage pumping station. The two panels designed and supplied by Selectra contain both electrical service entrance components including transformer, lighting panel and pump controls. The pump control panel has an inner door containing all of the operator control and pilot devices as well as the breaker handles and ETM’s. The interior of the panel contains the breakers and starters to run two pumps on a relay based float control system.

 

INSTRUMENTATION SUPPLIED:

LEVEL TRANSMITTER:

 

MAGNETIC FLOW METER:

 

ULTRASONIC FLOW METER:

 

MASS FLOW METER:

 

PRESSURE TRANSMITTER:

 

DIFFERENTIAL PRESSURE:

 

TURBIDITY ANALYSER:

 

CHLORINE ANALYSER:

 

 DISOLVED OXYGEN ANALYSER:

 

PH ANALYSER:

 

TEMPERATURE TRANSMITTER:

 

NUCULER DENSITY:

 

GAS DETECTION:

 

PRESSURE SWITCHES:

 

TEMPERATURE SWITCHES:

 

LEVEL SWITCHES/PROBES:

 

SIGNAL CONDITIONERS:

 

OTHER:

 

 

CONTROL PANEL INFORMATION:

PANEL DESCRIPTION

NUMBER

OF PANELS

RPU MANUFACTURER

PUMP CONTROL PANEL

2

N\A

 

PROGRAMMING AND DEVELOPMENT:

RPU PROGRAMMING:

 

OPERATOR INTERFACE PROGRAMMING:

 

COMPLETE MMI SYSTEM DEVELOPMENT:

 

 

 

BACK     TOP


 

JOB: NAME: Cambrige Gas

OWNER: CITY OF CAMBRIDGE

GENERAL CONTRACTOR: Elgin Construction

ELECTRICAL CONTRACTOR: Selectra Inc.

INSTRUMENTATION CONTRACTOR: Selectra Inc.

CONSULTANT: Connestoga Rovers and Associates

JOB DESCRIPTION: Landfill gas collection system and revise program for billing gas use.

 

COMPLETE SCOPE:

 

The original Cambridge Gas job which Selectra acted as both the Electrical and Instrumentation Contractor, was a station designed to extract methane gas from the landfill site and waste it using a flare. Selectra designed, built and programmed the Allen-Bradley SLC control panel that controlled the whole process. More recently the whole system was upgraded to supply the methane gas to a local manufacturer for use in preheating ovens in their manufacturing process. Selectra took on the job of modifying the original control system to allow the landfill gas to be transferred to the local manufacturers facility. We re-wrote the program to allow for these changes as well as writing a new program to take care of calculating the billing for the methane used, based on volume as well as quality of gas being provided. 

 

INSTRUMENTATION SUPPLIED:

LEVEL TRANSMITTER:

 

MAGNETIC FLOW METER:

 

ULTRASONIC FLOW METER:

 

MASS FLOW METER:

 

PRESSURE TRANSMITTER:

 

DIFFERENTIAL PRESSURE:

 

TURBIDITY ANALYSER:

 

CHLORINE ANALYSER:

 

 DISOLVED OXYGEN ANALYSER:

 

PH ANALYSER:

 

TEMPERATURE TRANSMITTER:

 

NUCULER DENSITY:

 

GAS DETECTION:

X

PRESSURE SWITCHES:

 

TEMPERATURE SWITCHES:

 

LEVEL SWITCHES/PROBES:

 

SIGNAL CONDITIONERS:

 

OTHER:

 

 

CONTROL PANEL INFORMATION:

PANEL DESCRIPTION

NUMBER

OF PANELS

RPU MANUFACTURER

PLC CONTROL PANEL

1

Allen Bradley SLC

 

 

PROGRAMMING AND DEVELOPMENT:

RPU PROGRAMMING:

X

OPERATOR INTERFACE PROGRAMMING:

X

COMPLETE MMI SYSTEM DEVELOPMENT:

 

 

 

BACK     TOP


 

INSTRUMENTATION HOME