JOB: NAME: Simcoe
OWNER: Regional Municipality
of Haldimand-Norfolk
COMPLETION:
GENERAL CONTRACTOR: T.R.
Hinan
ELECTRICAL CONTRACTOR:
Selectra Inc.
INSTRUMENTATION CONTRACTOR:
Selectra Inc.
CONSULTANT: B.J. Tworsanski
SCOPE: Regional Water Well
Control System
JOB: NAME: Eberts
OWNER: Regional Municipality
of Chatham-Kent
COMPLETION:
GENERAL CONTRACTOR:
Stonetown Construction
ELECTRICAL CONTRACTOR:
Selectra Inc.
INSTRUMENTATION CONTRACTOR:
Selectra Inc.
CONSULTANT: DILLON
SCOPE: Construction of new
Booster Pumping Station and SCADA SYSTEM
JOB: NAME: GTAA
Pumping Station
OWNER: Greater Toronto
Airport Authority
COMPLETION:
GENERAL CONTRACTOR: Kenaidan
Contracting
ELECTRICAL CONTRACTOR:
Selectra Inc.
INSTRUMENTATION CONTRACTOR:
Selectra Inc.
CONSULTANT: UMA Engineering
SCOPE: Construction of new Sewage
Pumping Station
JOB: NAME: Elmira
WPCP
OWNER: Region of Waterloo
COMPLETION: Fall/Winter 2001
GENERAL CONTRACTOR:
Wellington Construction
ELECTRICAL CONTRACTOR:
Selectra Inc.
INSTRUMENTATION CONTRACTOR:
Selectra Inc.
CONSULTANT: Stantec
Consulting
SCOPE: Complete upgrade of
Pollution Control Plant
JOB: NAME: Beaverton
WSP Automation
OWNER: Regional Municipality
of Durham
COMPLETION: 3/1/2002
GENERAL CONTRACTOR: Nadeco
ELECTRICAL CONTRACTOR:
Selectra Inc.
INSTRUMENTATION CONTRACTOR:
Selectra Inc.
CONSULTANT: CH2M Hill Canada
Limited
SCOPE: SCADA automation of
Water Treatment Plant
JOB: NAME: Alpine
Ski Club
OWNER: Town of Blue
Mountains_Collingwood
COMPLETION: Fall/Winter 2002
GENERAL CONTRACTOR: Hadovic
Construction
ELECTRICAL CONTRACTOR:
Selectra Inc.
INSTRUMENTATION CONTRACTOR:
Selectra Inc.
CONSULTANT: C.C. Tatham
& Associates Ltd.
SCOPE: Water Supply System
for Snow Making
JOB: NAME: Sleepy
Hollow
OWNER: Town of Blue
Mountains_Collingwood
COMPLETION: Spring 2002
GENERAL CONTRACTOR: Clearway
Construction
ELECTRICAL CONTRACTOR:
Selectra Inc.
INSTRUMENTATION CONTRACTOR:
Selectra Inc.
CONSULTANT: Ainley Group
SCOPE: Remote Sewage Pumping
Station
JOB: NAME: Cambrige
Gas
OWNER: CITY OF CAMBRIDGE
COMPLETION: Ongoing
GENERAL CONTRACTOR: Elgin
Construction
ELECTRICAL CONTRACTOR:
Selectra Inc.
INSTRUMENTATION CONTRACTOR:
Selectra Inc.
CONSULTANT: Connestoga
Rovers and Associates
SCOPE: Landfill gas
collection system and revise program for billing gas use.
JOB: NAME: Simcoe
OWNER: Regional Municipality of Haldimand-Norfolk
GENERAL CONTRACTOR: T.R. Hinan
ELECTRICAL CONTRACTOR: Selectra Inc.
INSTRUMENTATION
CONTRACTOR: Selectra Inc.
CONSULTANT: B.J, Tworsanski
JOB DESCRIPTION: Regional Water Well Control System
COMPLETE SCOPE:
On this job Selectra Inc. did the complete electrical
installation at the new Simcoe Water Well Pumping Station. We provided the
complete Instrumentation package for the Well Station as well as designing and
building the RTU control panel. We also
programmed the Bristol Babcock DPC 3330 RTU and provided a five node SCADA
system for controlling and monitoring the Simcoe area water supply system. The
Wonderware based MMI system used the tower level to control four Regional
pumping stations to supply water to The Town of Simcoe.
INSTRUMENTATION SUPPLIED:
LEVEL
TRANSMITTER: |
X |
MAGNETIC
FLOW METER: |
|
ULTRASONIC
FLOW METER: |
|
MASS
FLOW METER: |
|
PRESSURE
TRANSMITTER: |
|
DIFFERENTIAL
PRESSURE: |
|
TURBIDITY
ANALYSER: |
|
CHLORINE
ANALYSER: |
|
DISOLVED OXYGEN ANALYSER: |
|
PH
ANALYSER: |
|
TEMPERATURE
TRANSMITTER: |
|
NUCULER
DENSITY: |
|
GAS
DETECTION: |
|
PRESSURE
SWITCHES: |
X |
TEMPERATURE
SWITCHES: |
X |
LEVEL
SWITCHES/PROBES: |
X |
SIGNAL
CONDITIONERS: |
|
OTHER: |
|
CONTROL PANEL
INFORMATION:
PANEL
DESCRIPTION |
NUMBER OF
PANELS |
RPU MANUFACTURER |
RPU
CONTROL PANELS |
1 |
BRISTOL
BABCOCK |
PROGRAMMING AND
DEVELOPMENT:
RPU
PROGRAMMING: |
X |
OPERATOR
INTERFACE PROGRAMMING: |
|
COMPLETE
MMI SYSTEM DEVELOPMENT: |
X |
JOB: NAME: Eberts
OWNER: Regional Municipality of Chatham-Kent
GENERAL CONTRACTOR: Stonetown Construction
INSTRUMENTATION
CONTRACTOR: Selectra Inc.
CONSULTANT: Dillon Consulting
JOB DESCRIPTION: Construction of new Booster Pumping Station and SCADA
System
COMPLETE SCOPE:
On this job Selectra did the complete electrical installation
at the new Eberts Booster Pumping Station. Under this contract we also built
three Bristol Babcock DPC 3330 based RTU control panels; one at the booster
Pumping Station, one at the Dresden Elevated Tower, and a Data Concentrator for
installation at the Dresden Water Pollution Control Plant. Selectra was
responsible for programming the three RTU control panels supplied by us under
this contract. We were also responsible for developing the two node Wonderware
based SCADA system that tied the complete package together.
INSTRUMENTATION SUPPLIED:
LEVEL
TRANSMITTER: |
X |
MAGNETIC
FLOW METER: |
X |
ULTRASONIC
FLOW METER: |
X |
MASS
FLOW METER: |
|
PRESSURE
TRANSMITTER: |
X |
DIFFERENTIAL
PRESSURE: |
|
TURBIDITY
ANALYSER: |
|
CHLORINE
ANALYSER: |
X |
DISOLVED OXYGEN ANALYSER: |
|
PH
ANALYSER: |
|
TEMPERATURE
TRANSMITTER: |
|
NUCULER
DENSITY: |
|
GAS
DETECTION: |
|
PRESSURE
SWITCHES: |
|
TEMPERATURE
SWITCHES: |
X |
LEVEL
SWITCHES/PROBES: |
|
SIGNAL
CONDITIONERS: |
|
OTHER: |
|
CONTROL PANEL
INFORMATION:
PANEL
DESCRIPTION |
NUMBER OF
PANELS |
RPU MANUFACTURER |
RPU
CONTROL PANELS |
3 |
BRISTOL
BABCOCK |
PROGRAMMING AND
DEVELOPMENT:
RPU
PROGRAMMING: |
X |
OPERATOR
INTERFACE PROGRAMMING: |
|
COMPLETE
MMI SYSTEM DEVELOPMENT: |
X |
JOB: NAME: GTAA Pumping Station
OWNER: Greater Toronto Airport Authority
GENERAL CONTRACTOR: Kenaidan Contracting
ELECTRICAL CONTRACTOR: Selectra Inc.
INSTRUMENTATION
CONTRACTOR: Selectra Inc.
CONSULTANT: UMA Engineering
JOB DESCRIPTION: Construction of new Sewage Pumping Station
COMPLETE SCOPE:
On this job Selectra did the complete electrical installation
at the new GTAA Sewage Pumping Station. We were responsible for the design and
manufacture of an Allen-Bradley SLC 5/04 control panel. Selectra did the PLC and operator interface
programming. As well, the development of a single node Wonderware SCADA System
linking the new pumping station to an operator terminal in the Plumbing shop
was developed in house.
INSTRUMENTATION SUPPLIED:
LEVEL
TRANSMITTER: |
X |
MAGNETIC
FLOW METER: |
|
ULTRASONIC
FLOW METER: |
|
MASS
FLOW METER: |
|
PRESSURE
TRANSMITTER: |
|
DIFFERENTIAL
PRESSURE: |
|
TURBIDITY
ANALYSER: |
|
CHLORINE
ANALYSER: |
|
DISOLVED OXYGEN ANALYSER: |
|
PH
ANALYSER: |
|
TEMPERATURE
TRANSMITTER: |
|
NUCULER
DENSITY: |
|
GAS
DETECTION: |
X |
PRESSURE
SWITCHES: |
|
TEMPERATURE
SWITCHES: |
X |
LEVEL
SWITCHES/PROBES: |
X |
SIGNAL
CONDITIONERS: |
|
OTHER: |
|
CONTROL PANEL
INFORMATION:
PANEL
DESCRIPTION |
NUMBER OF
PANELS |
RPU MANUFACTURER |
PLC
CONTROL PANELS |
1 |
ALLEN-BRADLEY |
PROGRAMMING AND DEVELOPMENT:
RPU
PROGRAMMING: |
X |
OPERATOR
INTERFACE PROGRAMMING: |
X |
COMPLETE
MMI SYSTEM DEVELOPMENT: |
X |
JOB: NAME: Elmira WPCP
OWNER: Region of Waterloo
GENERAL CONTRACTOR: Wellington Construction
ELECTRICAL CONTRACTOR: Selectra Inc.
INSTRUMENTATION
CONTRACTOR: Selectra Inc.
CONSULTANT: Stantec Consulting
JOB DESCRIPTION: Complete upgrade of Water Pollution Control Plant
COMPLETE SCOPE:
This job involved the complete reworking of the Elmira Water
Pollution Control Plant. Selectra was
the Electrical Contractor on this project. Electrically, Selectra was
responsible for installation of the complete underground from the service
entrance to the feeders for the local control panels. We were responsible for
the supply and installation of seven Motor Control Centers and the wiring of
all of the associated devices including blowers, pumps, and motorized valves.
Selectra was also the Instrumentation Contractor on this job. We supplied all
of the instrumentation on the job as well as supplying seven SLC 5/04 based
control panels and ten local control panels with flex I/O. We also supplied
Heater control panels and two Backup Float control panels. Selectra was also
responsible for installation of the three communication networks used on this
job. The PLC’s were interconnected using a DH+ network, local control panels
were interconnected using Remote I/O and the VFD’s used DeviceNet to talk to
the PLC’s.
INSTRUMENTATION SUPPLIED:
LEVEL
TRANSMITTER: |
X |
MAGNETIC
FLOW METER: |
X |
ULTRASONIC
FLOW METER: |
|
MASS
FLOW METER: |
X |
PRESSURE
TRANSMITTER: |
X |
DIFFERENTIAL
PRESSURE: |
|
TURBIDITY
ANALYSER: |
|
CHLORINE
ANALYSER: |
|
DISOLVED OXYGEN ANALYSER: |
X |
PH
ANALYSER: |
|
TEMPERATURE
TRANSMITTER: |
|
NUCULER
DENSITY: |
|
GAS
DETECTION: |
X |
PRESSURE
SWITCHES: |
X |
TEMPERATURE
SWITCHES: |
X |
LEVEL
SWITCHES/PROBES: |
X |
SIGNAL
CONDITIONERS: |
|
OTHER: |
|
CONTROL PANEL
INFORMATION:
PANEL
DESCRIPTION |
NUMBER OF
PANELS |
RPU MANUFACTURER |
PLC
CONTROL PANELS |
7 |
ALLEN-BRADLEY |
PROGRAMMING AND
DEVELOPMENT:
RPU
PROGRAMMING: |
|
OPERATOR
INTERFACE PROGRAMMING: |
|
COMPLETE
MMI SYSTEM DEVELOPMENT: |
|
JOB: NAME: Beaverton WSP Automation
OWNER: Regional Municipality of Durham
GENERAL CONTRACTOR: Nadeco
ELECTRICAL CONTRACTOR: Selectra Inc.
INSTRUMENTATION
CONTRACTOR: Selectra Inc.
CONSULTANT: CH2M Hill Canada Limited
JOB DESCRIPTION: SCADA Automation of Water Treatment Plant
COMPLETE SCOPE:
On the Beaverton job Selectra was the Electrical as well as the
Instrumentation Contractor. This job involved the complete automation of the
Beaverton Water Treatment Plant. We were responsible for the design and supply
of four GE Fanuc based PLC panels that used Ethernet communication to pass
information back and forth between themselves and the WonderWare based Operator
control stations. The new control system was paralleled with the existing
control system so that the Water Plant could be run in manual if
necessary. All of the change over to
the new system had to be done with only minor shutdowns as the Water Plant had
to remain operational throughout the whole job. Selectra was also responsible
for both the programming of the PLC’s and the development of the WonderWare
based Man Machine interface for this project.
INSTRUMENTATION SUPPLIED:
LEVEL
TRANSMITTER: |
X |
MAGNETIC
FLOW METER: |
|
ULTRASONIC
FLOW METER: |
|
MASS
FLOW METER: |
|
PRESSURE
TRANSMITTER: |
|
DIFFERENTIAL
PRESSURE: |
|
TURBIDITY
ANALYSER: |
|
CHLORINE
ANALYSER: |
|
DISOLVED OXYGEN ANALYSER: |
X |
PH
ANALYSER: |
X |
TEMPERATURE
TRANSMITTER: |
X |
NUCULER
DENSITY: |
|
GAS
DETECTION: |
|
PRESSURE
SWITCHES: |
X |
TEMPERATURE
SWITCHES: |
|
LEVEL
SWITCHES/PROBES: |
|
SIGNAL
CONDITIONERS: |
X |
OTHER: |
|
CONTROL PANEL
INFORMATION:
PANEL
DESCRIPTION |
NUMBER OF
PANELS |
RPU MANUFACTURER |
PLC
CONTROL PANELS |
4 |
GE-FANUC |
PROGRAMMING AND
DEVELOPMENT:
RPU
PROGRAMMING: |
X |
OPERATOR
INTERFACE PROGRAMMING: |
|
COMPLETE
MMI SYSTEM DEVELOPMENT: |
X |
JOB: NAME: Alpine Ski Club
OWNER: Town of Blue Mountains_Collingwood
GENERAL CONTRACTOR: Hadovic Construction
ELECTRICAL CONTRACTOR: Selectra Inc.
INSTRUMENTATION
CONTRACTOR: Selectra Inc.
CONSULTANT: C.C. Tatham & Associates Ltd.
JOB DESCRIPTION: Water Supply System for Snow Making
COMPLETE SCOPE:
The Alpine Pumping Station pumps water from Georgian Bay to a
snow-making reservoir at the Alpine Ski Club. Selectra was the Electrical as
well as the Instrumentation contractor on this job. We were responsible for the
complete wiring of the pumping station as well as the design, supply, and
programming of the GE Fanuc based PLC control panel.
INSTRUMENTATION SUPPLIED:
LEVEL
TRANSMITTER: |
|
MAGNETIC
FLOW METER: |
|
ULTRASONIC
FLOW METER: |
|
MASS
FLOW METER: |
|
PRESSURE
TRANSMITTER: |
|
DIFFERENTIAL
PRESSURE: |
|
TURBIDITY
ANALYSER: |
|
CHLORINE
ANALYSER: |
|
DISOLVED OXYGEN ANALYSER: |
|
PH
ANALYSER: |
|
TEMPERATURE
TRANSMITTER: |
|
NUCULER
DENSITY: |
|
GAS
DETECTION: |
|
PRESSURE
SWITCHES: |
|
TEMPERATURE
SWITCHES: |
|
LEVEL
SWITCHES/PROBES: |
|
SIGNAL
CONDITIONERS: |
|
OTHER: |
|
CONTROL PANEL
INFORMATION:
PANEL
DESCRIPTION |
NUMBER OF
PANELS |
RPU MANUFACTURER |
PLC |
1 |
ALLEN-BRADLEY |
PROGRAMMING AND
DEVELOPMENT:
RPU
PROGRAMMING: |
X |
OPERATOR
INTERFACE PROGRAMMING: |
|
COMPLETE
MMI SYSTEM DEVELOPMENT: |
|
JOB: NAME: Sleepy Hollow
OWNER: Town of Blue Mountains_Collingwood
GENERAL CONTRACTOR: Clearway Construction
ELECTRICAL CONTRACTOR: Selectra Inc.
INSTRUMENTATION
CONTRACTOR: Selectra Inc.
CONSULTANT: Ainley Group
JOB DESCRIPTION: Remote Sewage Pumping Station
COMPLETE SCOPE:
The Sleepy Hollow Pumping Station is a self-contained sewage
pumping station. The two panels designed and supplied by Selectra contain both
electrical service entrance components including transformer, lighting panel
and pump controls. The pump control panel has an inner door containing all of
the operator control and pilot devices as well as the breaker handles and
ETM’s. The interior of the panel contains the breakers and starters to run two
pumps on a relay based float control system.
INSTRUMENTATION SUPPLIED:
LEVEL
TRANSMITTER: |
|
MAGNETIC
FLOW METER: |
|
ULTRASONIC
FLOW METER: |
|
MASS
FLOW METER: |
|
PRESSURE
TRANSMITTER: |
|
DIFFERENTIAL
PRESSURE: |
|
TURBIDITY
ANALYSER: |
|
CHLORINE
ANALYSER: |
|
DISOLVED OXYGEN ANALYSER: |
|
PH
ANALYSER: |
|
TEMPERATURE
TRANSMITTER: |
|
NUCULER
DENSITY: |
|
GAS
DETECTION: |
|
PRESSURE
SWITCHES: |
|
TEMPERATURE
SWITCHES: |
|
LEVEL
SWITCHES/PROBES: |
|
SIGNAL
CONDITIONERS: |
|
OTHER: |
|
CONTROL PANEL
INFORMATION:
PANEL
DESCRIPTION |
NUMBER OF
PANELS |
RPU MANUFACTURER |
PUMP CONTROL
PANEL |
2 |
N\A |
PROGRAMMING AND
DEVELOPMENT:
RPU
PROGRAMMING: |
|
OPERATOR
INTERFACE PROGRAMMING: |
|
COMPLETE
MMI SYSTEM DEVELOPMENT: |
|
JOB: NAME: Cambrige Gas
OWNER: CITY OF CAMBRIDGE
GENERAL CONTRACTOR: Elgin Construction
ELECTRICAL CONTRACTOR: Selectra Inc.
INSTRUMENTATION
CONTRACTOR: Selectra Inc.
CONSULTANT: Connestoga Rovers and Associates
JOB DESCRIPTION: Landfill gas collection system and revise program for
billing gas use.
COMPLETE SCOPE:
The original Cambridge Gas job which Selectra acted as both
the Electrical and Instrumentation Contractor, was a station designed to extract
methane gas from the landfill site and waste it using a flare. Selectra
designed, built and programmed the Allen-Bradley SLC control panel that
controlled the whole process. More recently the whole system was upgraded to
supply the methane gas to a local manufacturer for use in preheating ovens in
their manufacturing process. Selectra took on the job of modifying the original
control system to allow the landfill gas to be transferred to the local
manufacturers facility. We re-wrote the program to allow for these changes as
well as writing a new program to take care of calculating the billing for the
methane used, based on volume as well as quality of gas being provided.
INSTRUMENTATION SUPPLIED:
LEVEL
TRANSMITTER: |
|
MAGNETIC
FLOW METER: |
|
ULTRASONIC
FLOW METER: |
|
MASS
FLOW METER: |
|
PRESSURE
TRANSMITTER: |
|
DIFFERENTIAL
PRESSURE: |
|
TURBIDITY
ANALYSER: |
|
CHLORINE
ANALYSER: |
|
DISOLVED OXYGEN ANALYSER: |
|
PH
ANALYSER: |
|
TEMPERATURE
TRANSMITTER: |
|
NUCULER DENSITY: |
|
GAS
DETECTION: |
X |
PRESSURE
SWITCHES: |
|
TEMPERATURE
SWITCHES: |
|
LEVEL
SWITCHES/PROBES: |
|
SIGNAL
CONDITIONERS: |
|
OTHER: |
|
CONTROL PANEL
INFORMATION:
PANEL
DESCRIPTION |
NUMBER OF
PANELS |
RPU MANUFACTURER |
PLC
CONTROL PANEL |
1 |
Allen Bradley
SLC |
PROGRAMMING AND
DEVELOPMENT:
RPU
PROGRAMMING: |
X |
OPERATOR
INTERFACE PROGRAMMING: |
X |
COMPLETE