ELECTRICAL JOB LIST
HERE IS A SHORT LIST OF A FEW OF THE JOBS WHERE WE HAD OTHER
INSTRUMENTATION CONTRACTORS SUB-CONTRACT FOR US.
JOB: NAME: Toromont
Energy Erb Street Landfill
OWNER: Toromont Energy
COMPLETION:
GENERAL CONTRACTOR: Selectra
Inc.
ELECTRICAL CONTRACTOR:
Selectra Inc.
INSTRUMENTATION CONTRACTOR:
Toromont Energy
CONSULTANT: B. Murdock
Engineering
SCOPE: Construction of new
CO-Generation Facility using waste gas from Landfill
JOB: NAME: Moore Creek
OWNER: Greater Toronto
Airport Authority
COMPLETION: Spring 2001
GENERAL CONTRACTOR: Kenaidan
Contracting
ELECTRICAL CONTRACTOR:
Selectra Inc.
INSTRUMENTATION CONTRACTOR:
Summa Engineering
CONSULTANT: Azurix North
America
SCOPE: Construction of new
Storm Water Storage Facility
JOB: NAME: Parry Sound Water Treatment Plant
OWNER: PUC of the Town of
Parry Sound
COMPLETION: Spring 2001
GENERAL CONTRACTOR: Kenaidan
Contracting
ELECTRICAL CONTRACTOR:
Selectra Inc.
INSTRUMENTATION CONTRACTOR:
Bristol Babcock
CONSULTANT: CH2M Hill Canada
Limited
SCOPE: Complete upgrade of
Water Treatment Plant
JOB: NAME: Toromont Energy Erb Street
Landfill
OWNER: Toromont Energy
GENERAL CONTRACTOR: Selectra Inc.
ELECTRICAL CONTRACTOR: Selectra Inc.
INSTRUMENTATION
CONTRACTOR: Toromont Energy
CONSULTANT: B. Murdock Engineering
JOB DESCRIPTION: Construction of new CO-Generation Facility using
waste gas from Landfill
COMPLETE SCOPE:
On the Tormont Energy job landfill gas is used to run gas
powered generators in a co-generation facility co-owned by Tormont Energy and
The City of Waterloo. Selectra was the electrical contractor on the original
job and we have been asked back to wire up a new generator that they are adding
to the station.
JOB: NAME: Moore Creek
OWNER: Greater Toronto Airport Authority
GENERAL CONTRACTOR: Kenaidan Contracting
ELECTRICAL CONTRACTOR: Selectra Inc.
INSTRUMENTATION
CONTRACTOR: Summa Engineering
CONSULTANT: Azurix North America
JOB DESCRIPTION: Construction of new Storm Water Storage Facility
COMPLETE SCOPE:
The Greater Toronto Airport Authority (GTAA) owns the Moore
Creek Storm Water Facility. It is a large tank designed to handle storm water
overflow at the GTAA. Selectra was the Electrical Contractor on this project
and Summa Engineering did the Instrumentation as a sub-contractor to Selectra.
JOB: NAME: Parry Sound Water Treatment
Plant
OWNER: PUC of the Town of Parry Sound
GENERAL CONTRACTOR: Kenaidan Contracting
ELECTRICAL CONTRACTOR: Selectra Inc.
INSTRUMENTATION
CONTRACTOR: Bristol Babcock
CONSULTANT: CH2M Hill Canada Limited
JOB DESCRIPTION: Complete upgrade of Water Treatment Plant
COMPLETE SCOPE:
Selectra was the Electrical Contractor on this job that
involved the upgrading of the Parry Sound Water Treatment Plant and the
addition of a new filtration system. Bristol Babcock did the Instrumentation on
this project as a subcontractor to Selectra.